Your position: Home > Europe > 160T Straddle Carrier for Spanish HSR Project

160T Straddle Carrier for Spanish HSR Project

160T Straddle Carrier

Overview
There was a need for straddle carrier capable of handling the large volumes of material required for the construction and maintenance of the railway. Therefore, Huadelift will design a 160ton straddle carrier to transport large sections of railway tracks, sleepers and other materials for the Spanish project.

 

160T Straddle Carrier Solution
Our engineers will design a straddle carrier that can lift and transport heavy loads of up to 160ton, ensuring that the straddle carrier can operate on different types of terrain and in varying weather conditions. The straddle carrier will incorporate safety features such as automatic brakes, an emergency stop button and an anti-collision system to prevent accidents. It is also possible to optimize the performance of the straddle carrier by minimizing energy consumption and reducing downtime for maintenance.

 

160T Straddle Carrier    160T Straddle Carrier

 

As requested by the client, our engineers have developed a detailed design that includes all the necessary components and subsystems, such as the lifting mechanism, hydraulic system and control system for the straddle carrier. The client was pleased with our straddle carrier design scheme and we delivered the straddle carrier to Spain on time after the completion of crane production commissioning.

 

Result
The 160ton straddle carrier is the successful completion of a project that meets the needs of the Spanish high-speed railway project. The straddle carrier will be able to transport heavy loads efficiently and safely, reducing the time and cost required to build and maintain the railway. In addition, incorporating energy-saving features of straddle carrier will reduce the overall environmental impact of the project.

Customize Solutions
Our teams are on hand to provide you with the right lifting solutions
Tips for Messages
Load capacity(ton)?
Span of the crane(m)?
Max. lifting height of the crane(m)?
What materials will be handled?
How many hours will the crane work per day?
Your project introduction: project working site, project budget, etc.

    Related Cases